Components
COMPONENTS
ILLUSTRATION
|
*1 | SHIFT LEVER KNOB SUB-ASSEMBLY |
- | - |
Installation
INSTALLATION
PROCEDURE
1. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY
| (a) Install the shift lever knob sub-assembly to the transmission floor shift assembly. |
|
| (b) Engage the 2 claws to connect the shifting hole cover sub-assembly as shown in the illustration. NOTICE: Make sure that the shifting hole cover sub-assembly does not twist after installing the shift lever knob sub-assembly. |
|
Removal
REMOVAL
PROCEDURE
1. REMOVE SHIFT LEVER KNOB SUB-ASSEMBLY
| (a) Disengage the 2 claws to disconnect the shifting hole cover sub-assembly as shown in the illustration. |
|
| (b) Using a screwdriver with its tip wrapped with protective tape, expand the left side of the clip and remove the shift lever knob sub-assembly from the transmission floor shift assembly as shown in the illustration. NOTICE: Be careful not to damage the shift lever knob sub-assembly. |
|
Toyota Avalon (XX50) 2019-2022 Service & Repair Manual > Hybrid Control System: Indicator Circuit. Inverter Low-voltage Circuit. Motor High-voltage Circuit
Indicator Circuit DESCRIPTION In accordance with the shift lever position, each shift position indicator light will turn on. WIRING DIAGRAM PROCEDURE 1. CHECK SHIFT POSITION INDICATOR (a) Turn the power switch on (ACC). (b) Check that each shift position indicator light turns on correctly. Result Pr ...